The last push with Max to get the remaining boards erected and the cable runs to the board terminals. At the end of erecting ten boards, twenty sets of legs (with forty nuts and bolts) plus the 22 bolts between boards I, in true MFI fashion, end up with two left over bolts – which is giving me pause for concern. I am going to have to go round and see if I can find out where they should be as I am not at all sure that there ought to be any leftover.

Most of the main cables are now in place at baseboard ends and I need to devise the plan for powering it all up plus rectifying the problems arising from storage – some track is going to need replacing so I need to obtain some track as I think I am going to cut out some sections and replace – but with the added difficulty of adding power as I know that relying on connectors is not ideal.

There will probably be a gap as I plan the next stage – this week has been largely physical and the next stage is technical. There is still one gap between boards which I have to close but I need to go round the layout ensuring level in all directions as I know there is one point which was not quite level. It will be down to some juggling.

Looking at the photos it is obvious that some tidying in the room would be a good idea before moving forward with the repair work.