Layout Report – 1

A long time ago I had a model railway – which got as far as bare track and wiring.  For the last forty year I have been “N” and have a huge quantity of models acquired over those long year which have been joined by the hugely improved renditions from Farish and Dapol in the last ten years or so.

So about three years ago I could see that the daughters were leaving home and that eventually a bedroom would become available.  A lot of effort went into thinking and making contact with poindividuals capable of providing the basic layout.

Not quite the final layout looks like this:

krb8

The central terminus and associated sidings may not be built to that design.

Work commenced on the external figure of 8 and on Friday 4 July it was collected from Shrewsbury.

Leave a comment